Reserve 5 – Industrial Warehouse
Project Name | Reserve 5 – Industrial Warehouse |
---|---|
Client Name | Cream Property |
Brief Description |
5120 Industrial Warehouse with 47no 9,5m high precast concrete columns with Peikko mechanical connections. 2800m² of Hollow-core walling was slid into channels cast into the columns. 3no precast staircases and 750m² of hollow-core flooring slabs were also installed into this fast track building. |
Type of Structures where Precast is used | Warehouse |
Contract Duration | 2 Months |
Completion Date | 9/30/2023 |